GRINDING STATION IN YANGIYUL, TASHKENT, UZBEKISTAN
Located at the old concrete precast plant in Yangiyul, Tashkent, Uzbekistan, this project includes the construction of a 3,300t/d cement grinding station from material incoming (unloading) to cement outgoing. The station adopts the closed-circuit grinding system combining the mature roller presses and two F3.813m cement grinders with clinker unloading into pits.


Roller Press Conveying



Site of Equipment


Copyright 2014 @ CAMCE Infrastructure (|) Private Limited
Disclaimer | Privacy Policy